DC, LV AC and 33 kV cable sizing for an Electric Vehicle Charging Forecourt at Braintree, comprising: 33 kV DNO supply and customer substations, two 3 MVA substations and electric vehicle charging, 6,092 kWh BESS battery energy storage system and a 165.6 kW PV System.
AC and DC cable design for Grafham Water a 12 MWp Solar Farm located in Cambridgeshire.
Cable sizing (dc and ac) for a 25.704 MWp Solar PV system at Bilton, Hull.
DC, LV AC and 33 kV AC cable design for York SEC, a 34.73 MWp Solar PV system and 27.5 MWh battery system at Boscar Grange Farm.
6 MW battery storage solution located at Dorking and consisting of several containerised modules - customer swichroom module, transformers module, converter module and two battery modules. Finiite element thermal modelling of DC, AC and 11kV cables.
Provide technical advice to GRC for their solar farm developments (eight 5 MW site). Conceptual design for diesel generator farm options (stand alone or combined with solar) up to 20 MW.
Initial system design and connection application submission for the following solar farms: Tr Nyth, Stockley Hill , Twin Yards , Knotwood Fields , Ashland , Twin Oaks, Fulwood Grange and Penniment House.
Consultancy agreement to provide ongoing technical services in relation to the clients activities. Key focus is on developing tools to improve inhouse engineering functions and looking at specific specialist project issues.
Ongoing DC and AC cable sizing for various solar farms, including: Newton Downs [UK], Vlagtwedde [Netherlands], Apeldoorn [Netherlands] and Houten [Netherlands].
Develop calculation methodology and carry out several Matlab calculations of sheath currents and induced voltages in various cable arrangements.
Provide ongoing electrical consultancy design services in connection with Mann Power's hydroelectric projects. Carry out the design of DNO connections, parallel feeding of local facilities and associated cabling and systems.
Provide cable selection and calculations for three seperate long-run hydroelectric main a.c.cables and associated protection. Particular issues involved maintaining voltage rise within limits, protection with high earth fault loop impedance and cost comparisons of different options.