LV Cable Sizing [Hanger]
Speedmak
Sizing of main low voltage power cables for a new supply to an aircraft hanger. A key area of concern was the very long cable runs and achieving a cost effective solution given the large voltage drops experienced.
Luton Airport Generator Upgrade
London Luton Airport
We were appointed to develop the performance and installation specification for the upgrade of generator systems supplying Airfield Ground Lighting and other services. The project consisted of two new prime generators, with parallel operation and transfer switching equipment between generator and mains supply.
Luton Airport Fixed Ground Power
Bright Star Fuelling Services
Full feasibility study for the implementation of a Fixed Ground Power (FGP), 400 Hz system, including the project strategic definition, brief and concept design for the supply of 400 Hz power to approximately 50 stands. In addition the works involved a costing exercise for the design, install and operate bid and preliminary project planning.